Sunday, 7 November 2021

Work complete....machinery off site.

I was very surprised to see a bulldozer creating a shingle wall to the eastern side of the new harbour cut  this morning. 

 



However job done the bulldozer trundled back to 'base' along the beach.


Another visit at high tide and an amazing sight. 
The effect of the high spring tide combined perhaps by the new cut had  created an almost unbelievable sight. 
Just take a look below....

The old Little Lagoon from the path
Looking towards harbour from near the apple tree.


Seepage to the left of path to the old hide. Never seen that before.


A keen birder!

The metal seawall protection under water along its entire length.

Looking towards Church Norton  !

The old Little Lagoon now enlarged, considerably!

As above.

The submerged protection metal seawall.



From the south side of  the 'old' Little Lagoon

Interesting!






No comments:

Post a Comment