The outgoing tide this afternoon through the cut.
Work will continue enlarging the entrance and an excavator started work late afternoon when the water level permitted.
This is a blog recording various happenings on Pagham Beach in West Sussex on the south coast of the U.K. Although only set up in January 2014 previous mentions of the beach can be found on my paghambirder blog which is devoted to my lifelong hobby of birding but focused on sightings in and around Pagham Harbour.
The outgoing tide this afternoon through the cut.
Viewed from the Church Norton spit the project gave a very different idea of what's going on and it can be seen from the photos just below how soon the break through will be made. Having spoken to one of the operatives I was told that the plan was to make the final cut at noon.
View of the West Front Road bungalows from the Church Norton spit.
Not long now, surely.
I was anxious to see the moment of breakthrough from the Pagham side so beat a hasty retreat and arrived on Pagham spit at about a quarter to twelve expecting to see the action.
A bitter cold north wind. I waited but after an hour I decided enough was enough.
I looked back from the old car park and decided it must have been deferred for a while.
I was wrong and missed the historic moment!
Shame!!
Most of the activity is still very much on the seaward side of the spit.
The width of the cut can be seen to have widened considerably today.
....look carefully...top right!
The most obvious change is that the new island appears to be almost completed. It will be interesting to see this at high tide in a good light.

Tern island can be seen to the left in the distance with the Church Norton chapel in the centre. New Island (now known by birders as Peregrine Island) is just out of picture to right.
Work continues with two trucks making continuous trips from the 'cut' to deposit the shingle.
The main work on the 'cut' continues but most of the action is taking place on the seaward side and there is no apparent great change noted from the harbour side.(see below)
No doubt that will all change in time!More photos to come as the project continues this week.
As the opportunity of working on the spit 'cut' is limited by the tidal conditions every opportunity has to be taken to continue whenever. A force 8 gale with very heavy rain would have made conditions very difficult in the morning but by the time of low tide the rain had stopped.
A view of the workings from the eastern edge of the 'old' Little Lagoon which is now tidal. Here is a shot of it a low tide....
Looking eastward along the beach....
The heavy brigade arrives traversing the beach.....
At 9.00 a.m. this morning a huge low loader delivered a port-a-cabin to the 'old' carpark.
Then, at low tide at about 11.30 the first digger arrived on the beach and headed for the designated crossing point to Church Norton Spit. Several attempts were made but the water was too deep to make a road bridge.